Asd

วันพุธที่ 30 ธันวาคม พ.ศ. 2558

New domestic terminal at Don Mueang

Airports of Thailand opens new domestic terminal at Don Mueang International Airport in December 2015

The Airports of Thailand (AOT) opens Terminal 2 at the Don Mueang International Airport for domestic flights on 24 December, 2015. The facility has a capacity to handle 11.5 million passengers per year, and is equipped with six rows of check-in counters, totalling 70 counters, including 10 counters for passengers with disabilities.

The 24-December soft launch date follows the successful implementation of a three-day thorough trial operation which simulated real check-in conditions, luggage loading, immigration, and boarding of passengers. Public transport, including taxis and airport express buses, are available.
In order to ensure smooth experience for passengers, AOT is currently fine-tuning the final details of some other areas; such as, washrooms, restaurants, and shops.

The new domestic terminal is set for a full opening in February 2016.
AOT has ensured that the new terminal as well as current facilities on operations are renovated, maintained and operated in line with the international airport safety and security standards.
Don Mueang International Airport currently serves domestic and international flights by low-cost carriers, including Thai Smile, Nok Air, Thai AirAsia, Thai Lion Air, Orient Thai Airlines etc. It is also handling capacity of 28 million passengers per year while the full operation of the second passenger terminal at the Airport will bring the capacity to handle up to 40 million passengers per year.

ไม่มีความคิดเห็น:

แสดงความคิดเห็น